These roads are located in Phase-VI of DHA; however, with regards
to development these 2x roads are included in the infrastructure
dev works of Phase-VIII.
Work on these 2x roads have been delayed for 2x years as electric
poles located in the centre of the roads required to be shifted
to accommodate storm water drain. In order to break the impasse
a comprehensive survey was carried out to ascertain the possibility
of a surface flow also incorporating gate levels of adjacent houses.
The survey report indicated that surface flow was possible due to
availability of sufficient natural slope.
Finally it has been decided to start the road works and storm
water to be disposed off by natural flow through kerb and gutter
arrangement.
Work on these roads is expected to start by Aug 2009.
Saba Avenue
Asphalt Base has been completed
on this road between Kh-e- Ittehad & Kh-e- Iqbal. However, competent
Authority has desired to make this complete road accessible to traffic
so that commuters can travel upto Beach Avenue with ease and conveyance
on this 100 ft wide major artery.
Zulfiqar Streets
Zulfiqar Streets were previously under the contract for infrastructure
development of Sec A by a Chinese company by the name of M/s China
Geo Company. However, due to some constraints the contractor could
not undertake the work on these roads.
Therefore work on these streets
in being separately tendered and is expected to start by Aug 2009.
EARTH filling in phase-VIIi
Road in Phase-VIII has been raised to
provide sufficient slope for storm water drains into adjacent creek
by gravity flow.
However raised embankments are susceptible
to damages by heavy rainfall. To reinforce the raised embankments, earth-filling
with hard soil is to be done. This will serve as a multipurpose project
which will also cater for the filling of adjacent plots which have been
lowered due to raised embankments of the roads.
ELECTRIFICATION
WORKS
Street Lights in Sector A
Since Streets in Sec A has
been almost 95 per cent carpeted therefore Street Lights have to be
installed within Sector A Streets and along Major Roads in Sector
A. Estimated cost of the work is almost 200 Million. The work is to
be under taken in current Financial Year i.e. 2009-2010.
Electrification
of Sector B
This work includes laying of 11 KV electric distribution cable
in Sector B of Phase-VIII.
Since Sec B is to be opened for construction by Dec 2009, therefore,
electrification of Sec B is to be undertaken on top most priority.